[Q47-Q67] Ensure Success With Updated Verified MB-335 Exam Dumps [2025]

Share

Ensure Success With Updated Verified MB-335 Exam Dumps [2025]

Exam Materials for You to Prepare & Pass MB-335 Exam.


Microsoft MB-335 exam covers a wide range of topics related to Dynamics 365 Supply Chain Management, including inventory management, production control, procurement, sales order management, and warehouse management. MB-335 exam also tests the candidate's ability to implement and configure other related applications, such as Power Apps, Power Automate, and Power BI. Additionally, the exam measures the candidate's ability to work with various technologies and tools, such as SQL Server, Visual Studio, and Azure.


To pass the Microsoft MB-335 certification exam, candidates must have a sound understanding of the various components of Dynamics 365 Supply Chain Management, as well as their interdependencies. They should also have practical experience using the product to solve real-world business problems. MB-335 exam consists of around 40-60 multiple-choice questions that are designed to test candidates' knowledge and understanding of the product.


Microsoft MB-335 Exam is a challenging test that requires a comprehensive understanding of Supply Chain Management concepts and the ability to apply that knowledge to real-world scenarios. MB-335 exam requires a high level of preparation and familiarity with the tools and features of the Microsoft Dynamics 365 Supply Chain Management platform. Candidates are expected to have a deep understanding of the business processes involved in supply chain management and possess the skills to design and implement solutions that meet the unique needs of a client.

 

NEW QUESTION # 47
A company uses distributed hybrid topology within their Dynamics 365 Supply Chain Management system.
The company plans to build a manufacturing plant on a mountain to be closer to a required mineral source.
Internet connectivity is unreliable, and availability of bandwidth speed is limited. The company plans to deploy an operational edge scale unit for the plant to address the connectivity issue.
You need to determine where production operations can be performed.
Which method should you recommend?
To answer, drag the appropriate methods to the correct requirements. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:
To determine where production operations can be performed, you should recommend the following methods:
* Record the start of production: You should recommend the Production floor execution interface method. This method allows workers to register their daily work, such as when they start a job, report feedback about jobs, register indirect activities, and report absence1. Workers can use the production floor execution interface to sign in with their badge IDs and select the jobs that they want to start from the All jobs tab1. They can also view the details and instructions for each job, and report good quantities and scrap1.
* Report the number of production units completed and finished goods put away: You should recommend the Production floor execution interface and Warehouse Management mobile app methods. These methods allow workers to report the completion of production jobs and the movement of finished goods to inventory. Workers can use the production floor execution interface to complete a job by selecting it from the Active jobs tab and tapping Complete1. They can also print labels for the finished goods if required2. Workers can use the Warehouse Management mobile app to scan or enter license plates for the finished goods and put them away in a location3. They can also perform other warehouse operations, such as picking, packing, receiving, and cycle counting3.
* Report time spent training a new employee about line operation: You should recommend the Production floor execution interface method. This method allows workers to register indirect activities that are not related to a specific production job, such as training, meetings, or maintenance1. Workers can use the production floor execution interface to register an indirect activity by tapping Indirect activity on the toolbar and selecting an activity type from the list1. They can also enter a quantity or duration for the activity, and add a comment if needed1.
1: How workers use the production floor execution interface 2: Print labels 3: Install and connect the Warehouse Management mobile app


NEW QUESTION # 48
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.
The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor. Ingredient A is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient.
You need to ensure that the system is set up to support the manufacturing process.
Solution: Create a dimension-based product with configurations. Use a price model to calculate the different configurable option costs.
Does the solution meet the goal?

  • A. Yes
  • B. No

Answer: B

Explanation:
No, the solution does not meet the goal. A dimension-based product with configurations is used for discrete manufacturing, not process manufacturing. A price model is used to calculate the cost of different configurations of a product, not the cost of different concentrations of an ingredient. For process manufacturing, you need to use a formula-based product with batch attributes and potency management. A formula defines the materials, ingredients, and outcomes of a specific process. Batch attributes are used to capture the characteristics of a batch of products or ingredients. Potency management is used to adjust the quantity of an ingredient based on its concentration or strength1.
1: Configure formulas for process manufacturing in Dynamics 365 Supply Chain Management - Training | Microsoft Learn
Topic 3, Case Study 3 Adventure Works
This is a case study.Case studies are not timed separately.You can use as much exam time as you would like to complete each case.However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other question on this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question on this case study, click theNextbutton. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has anAll Informationtab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click theQuestionbutton to return to the question.
Background
Adventure Works Cycles is a high-end bicycle manufacturer in North America. Their standard model bicycles are available year-round. Limited-edition bicycle models are released several times a year to boutique retailers domestically.
Adventure Works has had the most success with their limited-edition bicycles. These bicycles have high margins, are in high demand, and have a strong following with the younger generation biking community.
Current environment
General
Adventure Works expects to triple their manufacturing capabilities in the next few years due to increasing demand. The company plans to invest in Dynamics 365 Finance, Dynamics 365 Supply Chain Management, and the Power Platform products to migrate from a custom-built enterprise resource planning (ERP) solution and Microsoft Excel worksheets.
Adventure Works sells only to the United States and Canada. Despite their limited market, they cannot keep up with current demand. Over time, they want to expand their market to remain profitable.
Adventure Works has no capabilities or budget to undertake any development beyond Excel formula-level tasks.
Bicycle manufacturing
* Bicycle models are measured and reported against how well a single model performs as a sum of all the variations of that model. For example, the Street Kid YOLO model sold 25,000 units in 2019 across all variations of the product, but the Purple Female frame made up 30 percent of that model's sales.
* The Street Kid YOLO models sell in different volumes depending on the market.
* The creation of production orders for bicycles occurs monthly and is based on historical sales.
* Each part of a bicycle's assembly occurs at a different station in the Adventure Works production facility.
* A piece of paper that has eight sections accompanies a bicycle throughout the manufacturing process.
As each step is completed, the respective section is completed and signed off by a production worker.
* The completed paper is used in the put-away process by the warehouse workers.
Financials
* The standard model and limited-edition bicycle teams are separate operating units within the manufacturing division. Financials are tracked and reported separately even though they are produced and sold in the same sales channels.
* Updates to the standard model bicycle models are created when a part for a bicycle becomes unavailable. This can change the cost of the product.
* An updated model of a bicycle with new parts will be maintained as a new item and have a new price.
However, it will look like the exact same product to retailers and distributors.
Manufacturing process
The bicycle manufacturing process is shown in the following graphic:

Limited-edition bicycle process
The limited-edition bicycles are made up of an Adventure Works custom frame with all other parts created by local artists and manufacturers.
* Each bicycle has a unique set of new items that make up the bill of materials (BOM) because all parts are created to specification.
* A single pilot limited-edition bicycle is created as a proof of concept.
* Adventure Works occasionally reuses components from existing bicycles, but most limited-edition bicycles are made of handcrafted components designed to specifications.
* Each limited-edition bicycle is built, and hand signed by a single Adventure Works artisan.
* Sales price must be auto calculated after the cost price is derived.
* Before creating the proof of concept limited-edition bicycle, the approximate sales price needs to be determined through a cost-plus 20 percent calculation.
* All items except for the frame in the prototype process are considered finished items and can be sold individually.
* The frame items require modifications in accordance with the manufacturing process as well as painting.
* Each Adventure Works limited-edition bicycle artisan is scheduled to create a specific number of bicycles in a production run that must be completed by a certain date.
* Limited-edition bicycle artisans work exclusively on a given run of limited-edition bicycles and are not able to work on other tasks.
Limited-edition bicycle BOM assembly process
The prototype process for the limited-edition bicycles is shown in the following graphic:

Requirements
General
* Adventure Works will consist of three legal entities: the primary legal entity of the United States (AWUS), sales in Canada (AWCA), and an international expansion (AWIN).
* AWIN must be able to sell only standard model bicycles.
* AWUS and AWCA must be able to sell both standard model and limited-edition bicycles.
* Warehouse workers must use the Warehouse Management mobile application to manage all inventory
* inbound and outbound from the warehouse.
Bicycle manufacturing
* The handlebars, back wheels, and front wheels must not change for any of the bicycle model configurations.
* Standard model bicycle production scheduling must be configured to start as soon as possible.
* Bicycle components must be automatically reserved when the item is released to the production floor.
* Standard model bicycle production must be automatically created on a predefined schedule.
* As soon as bicycles are completed, they must be available to fulfill the backlog of orders.
* Limited-edition bicycle production must be configured to meet the end date for when the bicycles must be completed.
* Production orders need to track financials by standard model or limited-edition bicycle manufacturing teams.
* The system must log the immediate consumption of BOMs for traceability.
* All inventory is warehouse enabled.
* Finished goods are reported as finished by the warehouse worker who picks up the finished product from the packaging area.
* Finished products must automatically have put-away work completed for them.
New limited-edition bicycle process
Adventure Works is creating a new, limited-edition bicycle to commemorate the company's tenth anniversary.
The limited-edition bicycle will be designed for charity events and be produced for the summer season.
* The bicycle must be available in men's, women's, and unisex frame styles. It will be painted in one of
50 hand-painted designs representing the charity of the customer's choosing.
* A limited run of 100 bicycles must be created.
* The limited-edition bicycles must use the same production process as the standard model bicycles.
* The limited-edition bicycles must use the same parts used for previous limited-edition bicycles, except for the unique paint colors.
* Frames must be painted in-house.
* Five painting options are available only in the unisex frame style.
New limited-edition bicycle orders
* Customers must be able to place sales orders for the item in the chosen frame configuration, including style and color.
* When an order for the new limited-edition bicycle is created, payment must be provided.
* An approval for an order must exist for the order to be processed.
* Upon approval of an order, production must start immediately and not require re-entry of data.


NEW QUESTION # 49
A company makes engine parts used in the automotive industry.
They are in the process of retooling an existing manufacturing plant. They are looking to use Dynamics 365 for Finance and Operations to help support the Bill of Materials (BOM) product lifecycle for engineering version control.
You must translate existing production processes into the proper elements. You need to create BOM lifecycle states to translate existing production processes into the proper elements.
What type of BOM product lifecycle state should you create? To answer, select the appropriate BOM state in the answer area.

Answer:

Explanation:


NEW QUESTION # 50
You are the lead product design manage at a Process manufacturing plant.
A formula that produces egg yolks as a by-product. This by-product is added back into inventory at standard cost and can be used in other production batches.
You need to select the by-product cost allocation.
Which cost allocation type should you use?

  • A. Percent
  • B. Recycled
  • C. Per quantity
  • D. Per series

Answer: B


NEW QUESTION # 51
A company uses a Dynamics 365 Supply Chain Management.
The company requires rebate reduction principles so it can accurately manage rebate calculations. The principles must manage overlapping rebate deals and reduce rebates quarterly.
You need to configure the rebate reduction principles to meet the requirements.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:


NEW QUESTION # 52
You use the master planning module for Dynamics 365 Supply Chain Management.
Planned production orders have been created.
Several sales orders are canceled in response to concerns about recent online reviews of a product.
You need to enable the appropriate action message.
Which action message should you enable?

  • A. Derived actions.
  • B. Advance
  • C. Decrease
  • D. Postpone
  • E. Increase

Answer: C

Explanation:
The action message that you should enable is Decrease. Here is the explanation:
* An action message is a system-generated suggestion to change an existing planned, approved, or firmed order. Action messages are generated by the master planning calculation in response to changed requirements1. For example, the ship date or quantity is changed on a sales order after you've already created a purchase order to fulfill the demand for that sales order. In this case, the master planning
* calculation generates one or more action messages that suggest that you update the purchase order. You decide whether to make the changes that are suggested.
* The Decrease action message indicates that production orders, purchase orders, and other receipt transactions should be decreased to prevent excess inventory levels1. This action message is generated when there is less demand for a product than was previously planned. For example, if several sales orders are canceled, the master planning calculation will generate a Decrease action message for the corresponding planned production orders.
* To enable the Decrease action message, you must select it on the Coverage groups page for the coverage group or item that you want the message to apply to1. You can also specify a decrease margin, which is the minimum percentage difference between the current quantity and the suggested quantity that will trigger a Decrease action message1.


NEW QUESTION # 53
You need to implement the scheduled Kanban requirements.
Which rules should you use? To answer, drag the appropriate rules to the correct requirements. Each rule may be used once, more than once, or not at all. You may need to drag the spirt bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:
A close-up of a document Description automatically generated


NEW QUESTION # 54
You need to configure lot number control for inventory. Which option should you use?

  • A. Primary socking
  • B. Physical inventory
  • C. Blank receipt allowed
  • D. Blank issue allowed

Answer: B


NEW QUESTION # 55
You need to resolve the shop supervisor's issue.
Which options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:


NEW QUESTION # 56
You need to set up the state control for sales of motorcycles.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Create an exclusive restricted product list for California and add the motorcycle part to the list.
  • B. Create an exclusive restricted product list for Missouri and add the motorcycle part to the list.
  • C. Create an inclusive restricted product list for United States and add the motorcycle part to the list.
  • D. Create an inclusive restricted product list for United States. Do not add the motorcycle part to the list.

Answer: A,C

Explanation:
Reference:
https://stoneridgesoftware.com/working-with-restricted-products-in-dynamics-365-operations/
Topic 2, Fabrikam inc sanitation cleaning solutions
Background
Fabrikam Inc. is a manufacturer of sanitation cleaning solutions and equipment including carpet/floor cleaners, pressure washers, scrubbers and vacuums.
Fabrikam Inc. is a single legal entity based in New York city.
_ Current environment
Products manufactured
* Cleaning equipment
o floor cleaner
o pressure washers
o scrubbers
o vacuums
* Liquid cleaning solutions
o No scent
o Orange scent (subcontracted to a vendor named VendorA)
o Pine scent (subcontracted to a vendor named VendorA)
The production quantity for the finished unscented liquid cleaning solution is 40-liters. IngredientC 'or unscented liquid cleaning solution Is stored in inventory in 50-liter barrels and allocated in 50-liter increments. Two barrels of IngredientC are uses to produce a barrel of unscented liquid cleaning solution.
Production sites
* The Eastern United States facility manufactures equipment.
* The Western United States facility manufactures liquid cleaning solutions.
* Raw materials and finished products are stocked at the warehouse and distributed from the warehouse.
Warehouse facilities
The warehouse consists of the following zones:

_ Requirements
Cleaning equipment manufacturing
You identify the following require merits for manufacturing cleaning equipment:
* Production is Make to Stock and must be scheduled at an operational level.
* Machine equipment is produced on an assembly line. Scheduling must be based on production orders.
* Finished products must be packaged and shipped directly from the warehouse.
* To reduce delivery times and excess inventory, equipment must be produced as needed.
* The ability to schedule production must be based on resource capacity and the availability of required materials.
* Production order operations must be scheduled to start only when capacity and materials are available at the same time and in the required quantities.
Liquid cleaning solution manufacturing
* Production is Make lo Order and is scheduled at the job level. Products must be manufactured in batches.
* Finished products must be packaged and shipped directly from the warehouse.
* You must be able to calculate the estimated consumption of ingredients and ensure that the amount is divisible by the number of units the raw material is available.
* Formula changes must be reviewed and approved. You must ensure that approved formulas cannot be deleted or edited. Approved formulas may be deactivated.
* An ingredient used to manufacture unscented cleaning solution is defined as a restricted product. You must be able to automatically print a product safety data sheet (PSDS) with the packing slip for any order that includes unscented cleaning solution.
* Production must be scheduled to start by date and time according to the order that is specified by the production route.
* You must implement a scheduled Kanban rule that meets the following requirements:
o Prevent overloading a work cell for scheduled Kanbans.
o Visualize excess inventory in a supermarket.
o Store products in supermarkets before they are consumed or shipped.
* You must link relevant financial dimension data to the inventory transactions at each site to ensure that you can trace profit and loss figures directly to East site and West site respectively.
* You must set up production operations for sub-contracting of Pine scent and Orange scent solution to VendorA to ensure that a purchase order is automatically created based on estimation of a production order.
Costing
* The price of raw materials used for manufacturing unscented cleaning solution must be tracked based upon commodity exchange pricing. The margin and cost multiplier must be set up for commodity traded raw material.
* You must set up cost calculation groups to ensure that indirect costs that originate in the manufacturing of finished goods are recognized and absorbed into the product cost.
* The production manager needs to set up picking list journals and BOM item consumption.
Reporting
* Production control parameters must be setup for reporting of automatic BOM and Route consumption.
* You must create reports that include information about cost records and categories for items, and calculation formulas for indirect costs.
* You must treat manufactured items as purchased items for cost roll-up purposes during BOM calculations and reporting.
* You must configure automatic route consumption in connection with the automatic running of Report as finished.
Inventory control
You must not be required to track the tot number for items when you enter inventory information into the system. Lot numbers for items must be entered when items are picked from inventory.
Issues
Users report the following issues:
* The production manager observes that items are being deducted from inventory two times on production jobs. A shop supervisor mistakenly registers the process for assembling batteries for the pressure washers to Registered as prepared. You must reschedule the process for a future date.
* Customer1 orders 20 barrels of unscented solution. The order is confirmed. Production must be scheduled to start on December 21 to meet the customer's delivery deadline.
* User2 reports that costs for manufactured items are twice as high as expected.
* UserD reports that the formula for the liquid cleaning solution sometimes changes during production. You must enforce the policies regarding formula editing for current and future use.


NEW QUESTION # 57
A company produces paints and assembles bicycle frames.
You must account for paint drying time before assembly operations can begin.
You need to set up the operation to encompass queue times.
Which two options can you use? Each correct answer presents pad of the solution.
NOTE: Each correct selection is worth one point.

  • A. Enter a value in the queue time after field for the painting operation.
  • B. Enter a value in the transit time on the painting operation.
  • C. Build capabilities for each resource related to color.
  • D. Enter a value in the queue time before field for the assembly operation.
  • E. Make a resource group for each size and color and assign that group to the operation.

Answer: A,D

Explanation:
* Queue time is the time that a job waits at a work center before or after the job is processed1. You can use queue time to account for paint drying time before assembly operations can begin. You can specify queue time in minutes, hours, or days on the route operations that are attached to the production order2.
* To set up the operation to encompass queue times, you should do the following:
* Enter a value in the queue time after field for the painting operation. This value indicates how long the painted bicycle frames must wait at the painting work center before they can be moved to
* the next operation2. For example, if the paint drying time is 24 hours, you can enter 24 in the queue time after field and select Hours as the unit.
* Enter a value in the queue time before field for the assembly operation. This value indicates how long the painted bicycle frames must wait at the assembly work center before they can be processed2. For example, if there is a delay between the arrival of the frames and the start of the assembly, you can enter a value that reflects this delay in the queue time before field and select the appropriate unit.
* The other options are not correct, because they do not involve queue times. Building capabilities for each resource related to color would allow you to assign resources based on their color proficiency, but it would not account for paint drying time. Entering a value in the transit time on the painting operation would indicate how long it takes to move the painted bicycle frames from one work center to another, but it would not include the waiting time before or after the movement. Making a resource group for each size and color and assigning that group to the operation would allow you to group resources that have similar characteristics and can be used interchangeably in production, but it would not affect the queue times.
1: Queue times 2: Set up operations scheduling


NEW QUESTION # 58
You need to determine the sales price for a new limited-edition bicycle for the summer season.
What should you do?

  • A. Create the production order for the limited-edition bicycle and click estimate.
  • B. Run the pricing simulator for the limited-edition bicycle for a quantity of one.
  • C. Run inventory close for the BOM items for the limited-edition bicycle.
  • D. Run the category price rules for the limited-edition bicycle using a cost-plus calculation.

Answer: A

Explanation:
Topic 4, Case Study 4, Fabrikam inc.
Fabrikam, Inc. Is a discrete manufacturer of outdoor patio furniture. The company originated as a sole owner working from a home garage, then moved into a commercial storage space, and later into a full manufacturing facility. The company operates as two operating legal entities, one in the United States and the other in Mexico.
As the company grew, the existing software systems failed to grow with it. This meant that financial reporting was managed in an outdated accounting system; raw materials planning, production, and inventory control were managed in another system; and cost calculations were tracked in multiple spreadsheets managed by analysts.
Current environment
The Fabrikam. inc. engineering team uses a third-party computer-aided design (CAD) system for drawings.
These drawings are later introduced into one or more companies for sale. A customer service center handles complaint calls and places orders for distributors.
The current system landscape creates a lack of controls and visibility across the systems, leading to overages of some raw materials, shortages on others, and large quantities of scrap. Heavy production volume provides little to no room for system downtime. The staff manually creates production orders, which leads to double work for system entry later. This delay has a ripple effect into the materials planning.
The company currently sources teakwood from India, making it a more expensive and high-end material.
Cedar and redwood are both sourced from the Western US. Truck driver shortages across the nation have caused shipping costs to rise sharply.
Fabrikam, Inc. recently decided to expand into the gas firepit market. All products are currently being prototyped. The company decides that the firepit prototype should be initially available only in the United States. The firepits will be manufactured only in Nevada and Arizona. The firepits are produced as prototyping: this production line operates only on Mondays.
Fabrikam, Inc. has purchased new manufacturing equipment for the firepit metal fabrication. This purchase includes a warranty, which requires that the company perform routine maintenance. Fabrikam, inc. elects to complete the maintenance in house on a quarterly schedule and maintain appropriate records for warranty purposes. The metal fabrication equipment consists of three separate machines used in a single production process.
Fabrikam. Inc. made the decision to move to Dynamics 365 Supply Chain Management.
Application and environment
* Fabrikam, inc. must move systems and processing to software as a service (SaaS) whenever possible because the company does not have enough IT staff to support hardware.
Inventory and costing
* Finished goods fall into three categories:
* Wood furniture (teak, cedar, redwood) o Outdoor heating (firepits. gas heaters)
* Each outdoor heating item with slight variations, such as a chrome or steel finish, must have a unique item number, o Repair parts (nuts and bolts, ignitors. and other parts)
* The system must account for the fact that Fabrikam. inc. must take legal ownership of teakwood at the time of shipment, not at the time of receipt into the warehouse.
* The company must accrue for the costs of the teakwood materials as soon as the company takes ownership.
The company takes ownership at the time of shipment, which is posted prior to physical receipt at the warehouse.
Engineering
* Engineers who specialize in gas consumer goods will design the firepits and ate the only users with authority to release the products for sale.
* Engineering must notify customer service of any open orders that may contain a released product version that may be discontinued or delayed.
* The change request workflow must route to the engineer.
Production
* The raw material and subcomponent goods for the firepit must be managed by the engineer. This means the engineer must oversee any new items, material changes, address problems, and so on.
* The metal fabrication equipment must be tracked at the locations where the firepits are produced.
* The production team must operate on an all-day/everyday model, with each team operating in a 12-hour shift. This is a recent change to keep up with high demand for products, as well as for planning a new product line.
* Raw material and subcomponent items for the firepit prototype must not be available for use until engineering is ready for the prototype product release.
* Due to the production staff schedule, all equipment must be planned according to the staffing.
* Maintenance for each of the three pieces of machinery must be scheduled at the same time so that only the local maintenance technician works on the equipment.
* When the firepits are ready for the test market they must made be available for sale.
* The United States operating company must review any engineering products before they are available for sales or production orders,
* The engineering team must release the engineering product into the United States operating company,
* The engineering BOM lines must not be removed by the United States operating company.
Application and environment
* The operations manager is concerned that system downtime is so frequent that It is impacting efficiency due to the all-day/everyday production operation model.
Inventory and costing
* Fabrikam, inc. marketing campaigns in the desert states of Arizona- Nevada, and New Mexico have led to an increased demand for teakwood furniture to endure weather elements. Supply and demand for this wood lowered expected margins with increased shipping costs and price increases from the vendors.
* User1 reports that the inventory value of the teakwood is not on the financial reports, even though ownership of the product begins at the port of shipment,
* Upon receipt into the physical warehouse, User2 reports that the warehouse workers received less teakwood than the ordered amount on the purchase order.
Engineering and production
* As the firepits are produced and feedback received from the test market, records must be maintained of each revision to the firepit design.
* Firepits must have attributes associated with them to specify the type of gas line that is available for the firepit such as natural gas or propane.
* Customer service is receiving calls that the firepit ignition switch does not always work as expected. This issue was reported through an engineering change request.
* User3 reports resource issues on the production shop floor due to system maintenance issues and other delays. The company does not want User3 or the other workers to stop production.
* User4 reports that a bolt needed for cedar wood furniture is out of stock. A temporary substitution bolt was identified prior to starting the production order.
* User5 reports that a hinge for redwood furniture will be discontinued at the end of the year. Production must reflect an updated part.
* A large order was placed for 1,500 pieces of teakwood furniture and production orders must start as soon as possible.
* Users reports the following:
* Only 100 pieces of furniture can be produced on the night shift due to resourcing. Enough raw materials are on hand to complete 100 pieces, but not enough to produce all 1.500 pieces.
* The production floor is organized into dedicated production lines, each with their own warehouse. The warehouse workers must pick the raw materials to the correct warehouse location.


NEW QUESTION # 59
You need to calculate estimated consumption of ingredients for liquid cleaning solution.
What is the consumption? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 60
A beverage company uses Dynamics 365 Supply Chain Management batch processing for production- You need to identify the ingredient type used in batch processing when the base attribute of a product is added to a formula line.
What is the ingredient type?

  • A. active
  • B. filler
  • C. compensating
  • D. none

Answer: A

Explanation:
The ingredient type used in batch processing when the base attribute of a product is added to a formula line is Active. Here is the explanation:
A formula line is a line that identifies an ingredient or item that makes up a formula. A formula line can have one of these ingredient types: None, Active, Compensating, or Filler1. The ingredient type determines how the system handles the line during master planning and batch order production1.
The Active ingredient type indicates that the item is an active ingredient that has a variable quantity and a fixed potency. The active ingredient of a product is modeled by using a product-specific batch attribute that has a minimum value, a maximum value, and a target level2. The target level of a batch attribute represents the estimated percentage of an active ingredient in a product2.
When the base attribute of a product is added to a formula line, it means that the product has an active ingredient that is defined by the base attribute. Therefore, the ingredient type for the formula line should be Active. This way, the system can calculate the amount of ingredients to use in a production batch based on the concentration of active ingredients in selected product batches2. This process is known as batch balancing2.
1: Batch balancing 2: Formulas and formula versions


NEW QUESTION # 61
You need to resolve the issue for UserE.
Which configuration options should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:


NEW QUESTION # 62
You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation:

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration


NEW QUESTION # 63
A discrete manufacturer uses the time and attendance registration for production operations.
All employees register daily clock in and clock out times during a 40-hour. Monday through Friday workweek.
Pay periods are every two weeks. Workers are paid hourly.
The production manager will create work schedules with the following windows:
* Mandatory work hours
* Work hours during which employees can leave early without accruing absences
* Work hours during which employees can work extra time
If a junior production worker works over 90 hours in a pay period. the worker will receive lime and a half over 80 hours. If a senior production worker works over 90 hours in a pay period, the worker will receive double time over 80 hours.
Vou need to configure the system for these requirements.
Where should you configure this functionality? To answer, drag the appropriate forms to the correct requirements. Each form may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:
To configure the system for these requirements, you should use the following forms:
* Configure the overtime calculations: You should use the Workers form. This form allows you to set up and maintain information about workers, such as their personal details, employment status, and compensation1. You can also specify the overtime rate for each worker on the Time and attendance tab2. For example, you can set the overtime rate to 1.5 for junior production workers and 2 for senior production workers.
* Configure the periods of time that a worker can choose whether to work: You should use the Flex groups form. This form allows you to set up and maintain flex groups, which are groups of workers who have flexible work hours3. You can also define flex profiles for each flex group, which specify the mandatory work hours, the flex time hours, and the extra time hours for each day of the week3. For example, you can create a flex profile that has mandatory work hours from 8:00 AM to 4:00 PM, flex time hours from 4:00 PM to 6:00 PM, and extra time hours from 6:00 PM to 8:00 PM.
1: Workers 2: Set up overtime rates 3: Flex groups : [Flex profiles]


NEW QUESTION # 64
A manufacturer sends wiring harnesses to a vendor to be soldered to a connector. You create the subcontracting process in the bill of materials (BOM) and route to account for the items sent to the vendor.
You need to set up a new item model group for the service item.
Which three actions should you perform? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation:
A screenshot of a computer AI-generated content may be incorrect.


NEW QUESTION # 65
A beverage company uses Dynamics 365 Supply Chain Management batch processing for production- You need to identify the ingredient type used in batch processing when the base attribute of a product is added to a formula line.
What is the ingredient type?

  • A. active
  • B. filler
  • C. compensating
  • D. none

Answer: A


NEW QUESTION # 66
You need to calculate estimated consumption of ingredients for liquid cleaning solution.
What is the consumption? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation


NEW QUESTION # 67
......

Updated MB-335 Certification Exam Sample Questions: https://passguide.validtorrent.com/MB-335-valid-exam-torrent.html